Project Description
Size: 56,400 m2
Cost: $568 million
Location: Edmonton, Alberta
Green: Awarded LEED Silver
ONPA designed the ENRC as a replacement for the aging and overpopulated Remand Centre in downtown Edmonton. This facility is the largest and most technically advanced of its kind in Canada. It includes 5 general population pods, 1 segregation pod, and 1 medical/mental health pod. The facility has a population capacity of 1,947 inmates, with the possibility of adding another 3 pods and another 864 inmates.